30/03/2010 PRJ elektro signes contract with Dräger

Just recently PRJ elektro As made contract with Dräger Safety on deliver cables and cable-installation for the diving systems on the diving support vessel for Acergy under construction in Havyard Leirvik.
The vessel is a Havyard 858 design, with LOA: 120 m, and breadth 23 m. The work starts after Easter and shall according to plans be finished in July